Collect | Home Page 
   
Science & Technology Review  2015, Vol. 33 Issue (2): 59-63    DOI: 10.3981/j.issn.1000-7857.2015.02.008
Current Issue | Archive | Adv Search |
Fuzzy comprehensive evaluation model for early warning of production running in water flooding oilfield during high water-cut period
XIAO Wu1, JIANG Hanqiao2, FANG Wenchao2, LI Junjian2
1. Institute of Geosciences, Shengli Oilfield Company, Sinopec, Dongying 257015, China;
2. MOE Key Laboratory of Petroleum Engineering, China University of Petroleum, Beijing 102249, China

Copyright © Editorial office of Science & Technology Review
Tel: +86-10-62138113 Fax: +86-10-62138113 E-mail: jdbbjb@cast.org.cn
京ICP备14028469号-1