Outlet for Reservoir Silting of Three Gorges Project |
|
|
Abstract: The peper analyzed hidden danger of reservoir silting of the Three Gorges Project: upgrading of flood damage at the river reach of Chongqing; the river delta erosion. And suggested the new strategies: desilting at high concantration in vertical and horizontal pipes at the dam area; the silt liquefaction starting of buried seeper penstock at the river reach of Chongqing.
|
Received: 19 March 2009
|
|
|
|
[1] |
. The Mid-Yangtze Flood After the Commencement of the Three Gorges Project and the Countermeasures (II)[J]. , 2010, 28(23): 46-55. |
[2] |
. Situation of the Mid-Yangtze Flood after the Commencement of the Three Gorges Project and the Countermeasures (I)[J]. , 2010, 28(22): 60-68. |
[3] |
. Reducing Deposition in TGP Reservoir by Dredging Coarse Sediment[J]. , 2010, 28(09): 28-36. |
[4] |
. Measures against Problems in the Mid-Yangtze after the Completion of the Three Gorges Project (TGP)[J]. , 2006, 24(0606): 32-35. |
[5] |
. Problems in the Mid-Yangtze River after the Commencement of the Three Gorges Project (TGP)[J]. , 2006, 24(0605): 49-54. |
[6] |
. Suggestions on Sediment Research for Three Gorges Project during the 11th Five-Year Plan[J]. , 2006, 24(0601): 62-64. |
|
|
|
|