在大型近水平及缓倾斜煤田露天开采时,通常划分多个采区依次开采。在新旧采区接续时,存在采区转向过渡方式选择、采区接续位置确定、接续期间开拓运输系统布置、接续期间工程量搭配等技术难点。本文以蒙东能源控股有限责任公司西二号露天煤矿为例,分析了4种采区转向过渡方式,确定采用直角缓帮转向的过渡方式进行采区转向过渡。采用露天矿SMCAD软件进行三维地质建模,交互式设计工作帮,模拟工程位置,精确计算相应的工程量,提出了4种两个采区间的接续方案,揭示了4种方案的工程量搭配和过渡时间等变化规律,综合分析确定了合理的采区接续方案。
A large-horizontal and gently inclined coal mine is usually divided into several mining areas and is mined in one surface coal mine area at a time in proper order. The difficulties of connecting the old and new mining areas consist of the steering transition mode selection, the connecting position determination, the layout of the pit haulage system and the assignment of engineering. In this paper, three kinds of steering transition programs are analyzed and compared to determine a steering angle gentle slope transition program. In the determination of the next mining engineering location, the SMCAD software is used for 3D geological modeling, with interactive design of working slope, and the engineering position is simulated, with accurate calculation of quantities accordingly; four kinds of two section connecting scheme are proposed, considering the production stripping ratio and the mining transition time to finally establish the mining transition scheme.
[1] 徐志远, 才庆祥, 刘宪权. 安太堡露天煤矿采区转向过渡若干问题及对 策[J]. 煤炭工程, 2006(12): 9-11. Xu Zhiyuan, Cai Qingxiang, Liu Xianquan. Several problems and countermeasures on mining block direction change period of Antaibao Open Pit Mine[J]. Coal Engineering, 2006(12): 9-11.
[2] 顾正洪, 李曙光, 于汝绶. 近水平矿床露天矿采区的过渡方式[J]. 辽宁 工程技术大学学报: 自然科学版, 1997, 16(1): 24-27. Gu Zhenghong, Li Shuguang, Yu Rushou. Transition method of surface mines mining flat seams[J]. Journal of Fuxin Mining Institute: Natural Science, 1997, 16(1): 24-27.
[3] 张防修. 大型露天煤矿采区转向过渡开拓运输系统的研究[J]. 露天采 矿技术, 2007(6), 1-3. Zhang Fangxiu. Research on block steering transition and development transport system in large surface coal mine[J]. Opencast Coal Mining Technology, 2007(6): 1-3.
[4] 顾正洪, 李曙光. 近水平缓倾斜露天矿开采程序探讨[J]. 化工矿山技 术, 1993, 22(1): 10-13. Gu Zhenghong, Li Shuguang. Research on mining sequence for flat or gentle inclined surface mines[J]. Industrial Minerals & Processing, 1993, 22(1): 10-13.
[5] 马进岩. 条区转向接续期间排土系统优化[J]. 露天采煤技术, 2002(6): 9-10. Ma Jingyan. Dumping system optimization while strip zones converse direction during the continual period[J]. Opencast Coal Mining Technology, 2002(6): 9-10.
[6] Liu G W, Bai R C, Zhao J C. Research on three-dimensional template driven simulation of open pit mining[C]. International Conference on Computer Application and System modeling, Taiyuan, China, October 22-24, 2010.
[7] 刘光伟, 白润才, 曹兰柱. 基于多层DEM的露天矿三维地质模型构建 及其应用[J]. 煤炭工程, 2010(9): 73-75. Liu Guangwei, Bai Runcai, Cao Lanzhu. Establishment and application of surface mine 3D geological model base on multi DEM[J]. Coal Engineering, 2010(9): 73-75.
[8] 刘光伟, 白润才, 赵浩. 露天矿数字开采过程仿真及其应用[J]. 科技导 报, 2011, 29(34): 41-44. Liu Guangwei, Bai Runcai, Zhao Hao. Simulation of digital exploration process and its application in surface mine[J]. Science & Technology Review, 2011, 29(34): 41-44.
[9] 刘宪权, 李志强, 史建华. 分区开采转向接续期间存在的问题及对策[J]. 露天采煤技术, 2001(4): 8-9. Liu Xianquan,