Collect | Home Page 
   
  2013, Vol. 31 Issue (34): 34-38    DOI: 10.3981/j.isnn.1000-7857.2013.34.006
Articles Current Issue | Archive | Adv Search |
Prediction of Backfill Drill-hole Life Based on Combined Model of GA-SVM and Neural Network
ZHANG Qinli, CHENG Jian, CHEN Qiusong, HU Wei, ZHOU Bihui
School of Resources and Safety Engineering, Central South University, Changsha 410083, China

Copyright © Editorial office of Science & Technology Review
Tel: +86-10-62138113 Fax: +86-10-62138113 E-mail: jdbbjb@cast.org.cn
京ICP备14028469号-1