Due to the limited well test data, it is difficult to obtain effective information about deliverability in some wells. In this paper, the calibration factor of deliverability is introduced and the calculation methods of the influencing factors are studied, to establish a deliverability forecasting method. The geophysical logging static information is first calibrated by the dynamic data of the well test. Then the deliverability of the whole field is forecasted by the calibrated static data. The seismic data, the geophysical logging data at the beginning of exploration and production, and the well test dynamic data of few important wells are made the best use in this method. This method is applied in some wells in the M gas field. The forcasting deliverability results agree well with the actual deliverability. The calculation precision of the new method is high enough to meet the demand of the project design.
ZHU Lei
. The method of multi well deliverability forecasting based on the geophysical logging information and the limited well testing data[J]. Science & Technology Review, 2015
, 33(9)
: 59
-63
.
DOI: 10.3981/j.issn.1000-7857.2015.09.010
[1] 李士伦. 天然气工程[M]. 北京: 石油工业出版社, 2008. Li Shilun. Natural gas engineering[M]. Beijing: Petroleum Industry Press, 2008.
[2] 唐洪俊, 钟水清, 徐永高, 等. 用不稳定试井确定气井产能方法的评价与研究[J]. 钻采工艺, 2006, 29(3): 31-32. Tang Hongjun, Zhong Shuiqing, Xu Yonggao, et al. Evaluation and research of determining gas well deliverability method by using nonstabilized well test[J]. Drilling & Production Technology, 2006, 29 (3): 31-32.
[3] 李治平, 赵必荣, 张敏渝, 等. 应用气井压力恢复曲线确定气井产能[J]. 天然气工业, 1998, 18(6): 63-65. Li Zhiping, Zhao Birong, Zhang Minyu, et al. By use of the pressure build-up curve of gas well to determine its productivity[J]. Natural Gas Industry, 1998, 18(6): 63-65.
[4] 唐洪俊, 赵必荣. 用压力恢复试井资料预测气井产能的新方法[J]. 钻采工艺, 1996, 19(6): 41-43. Tang Hongjun, Zhao Birong. Evaluation and research of determining gas well deliverability method by using the pressure build-up test[J]. Drilling & Production Technology, 1996, 19(6): 41-43.
[5] 陈元千. 气井垂直管流计算方法的推导与应用[J]. 断块油气田, 2010, 17(4): 443-447. Chen Yuanqian. Derivation and application of calculating methods of vertical pipe fiow in gas wells[J]. Fault-Block Oil & Gas Field, 2010, 17(4): 443-447.
[6] 吴胜和. 储层建模[M]. 北京: 石油工业出版社, 1999. Wu Shenghe. Reservoir modeling[M]. Beijing: Petroleum Industry Press, 1999.
[7] Jensen C L, Mayson H J. Evluation of permeability determined from repeat formation tester measurements made in the Prudhoe Bay field[C]// SPE 60th Annual Technical Conference, Las Vegas, USA, September 22-25, 1985.
[8] Yildiz Turhan, Langlinais Julius. A reservoir model for wireline formation testing[C]//SPE Rocky Mountain Regional/Low Permeability Reservoirs Symposium, Denver, USA, March 6-8, 1990.
[9] Semmelbeck M E, Dewan J T, Holditch S A. Invasion-based method for estimating permeability from logs[C]//SPE Annual Technical Conference, Dalas, USA, October 22-25, 1995.
[10] Akram A H, Fitzpatrick A J, Halford F R. A model to predict wireline formation tester sample contamination[C]//SPE Annual Technical Conference, New Orleans, Louisiana, USA, September 27-30, 1998.