Fuel assemblies poolside inspection (PSI) is an important test in nuclear power plants. In this paper, PSI technology is introduced, including its principle, inspection contents, and various methods. The research status at home and abroad is summarized. PSI technology usually includes visual inspection, dimension measurement and oxide film measurement. It is an important method for irradiation effect research, and has been successfully used for surface inspection, irradiation growth and oxide layer thickness test of fuel assembly, providing necessary basis for evaluation of irradiation stability and integrity of pressurized water reactor fuel assembly.

Cite this article

REN Liang , LI Guoyun , JIANG Linzhi , ZHANG Xianpeng , KUANG Liuwei , TANG Hongkui , ZHANG Haisheng . Poolside inspection technology for pressurized water reactor fuel assemblies[J]. Science & Technology Review, 2015 , 33(18) : 91 -95 . DOI: 10.3981/j.issn.1000-7857.2015.18.015

References

[1] Rao N, Basu S. Poolside inspection facility for PWR fuel assemblies[J]. Iaea Tecdoc 1050, 1998, 40(2): 71-80.
[2] Tsuda T, Yamaguchi Y, Kosaka Y, et al. PIE results and new techniques applied for 55 GWd/t high burnup fuel of PWR[J]. Iaea Tecdoc 1635, 2003, 21(2): 34-42.
[3] Deng J X, Deng F. The setting of sipping test devices for irradiated fu-el in nuclear power plant[J]. Journal of Energy and Power Engineering, 2002, 6(12): 13-16.
[4] Shin J, Kim J, Kwon J. Poolside examination techniques applied for de-velopment of an advanced PWR fuel, PLUS7[J]. Icone Eighteenth, 2010, 7(1): 113-121.
[5] Kim J, Kwon J, Shin J. KNFC experience in fuel repair and poolside ex-amination[J]. Pacific Basin Nuclear Conference Tirteenth, 2002, 4(2): 55-62.
[6] Park J. KNFC fuel service technology development[J]. Smirt Eighteenth, 2005, 1(12): 25-33.
[7] 刘勤, 马凤鸣, 刘鸣. 差动变压式传感器位移测量系统设计[J]. 天津工程师范学院学报, 2005, 3(15): 21-27. Liu Qin, Ma Fengming, Liu Ming. Design of a measuring system using differential transformer sensor[J]. Tianjin University of Technology, 2005, 3(15): 21-27.
[8] 丁捷, 朱丽兵. 燃料棒更换装置的三维建模和运动仿真[J]. 核技术, 2010, 33(2):4-13. Ding Jie, Zhu Libing. 3-D modeling and motion simulation of fuel rodreplacing equipment[J]. Nuclear Techniques, 2010, 33(2): 4-13.
[9] 张丽琴, 钟志民, 李劲松, 等. 燃料组件控制棒包壳在役超声涡流自动检测[J]. 无损检测, 2005, 27(1): 22-28. Zhang Liqin, Zhong Zhimin, Li Jinsong, et al. In-service ultrasonic and eddy current auto-inspecting of RCCA cladding[J]. Nondestructive Testing, 2005, 27(1): 22-28.
[10] 屈国普, 凌球, 郭兰英, 等. 一种用于退役核燃料元件包壳的破裂检测技术[J]. 核技术, 2005, 28(6): 111-116. Qu Guopu, Ling Qiu, Guo Lanying, et al. A safety check-up method for decommissioned reactor fuel element cladding[J]. Nuclear Techniques, 2005, 28(6): 111-116.
[11] 曹殿鹏, 霍小东. VVER燃料组件变形对象限功率倾斜的影响[J]. 原子能科学技术, 2013, 47(增1): 15-19. Cao Dianpeng, Huo Xiaodong. Effect of VVER fuel assembly deformation on quadrant power tilt[J]. Atomic Energy Science and Technology, 2013, 47(Suppl 1): 15-19.
[12] 肖岷. 压水堆核电站燃料管理燃料制造与燃料运行[M]. 北京: 原子能出版社, 2009: 86-92. Xiao Min. Pressurized water reactor nuclear power plant fuel management, fuel fabrication and fuel run[M]. Beijing: Atomic Energy Press, 2009: 86-92.
[13] 李伟才, 肖中. 压水堆燃料组件弯曲变形机理及规避措施[J]. 核动力工程, 2004, 2(2): 49-55. Li Weicai, Xiao Zhong. Mechanism of fuel assembly bowing in PWR and preventive measures[J]. Nuclear Power Engineering, 2004, 2(2): 49-55.
[14] 邓浚献, 樊秀梅, 朱华, 等. 池边啜吸检测系统的研制[C]//中国核学会核能动力学会理事会换届暨第七届学术年会论文集. 北京: 中国原子能出版社, 2002: 25-29. Deng Xunxian, Fan Xiumei, Zhu Hua, et al. Development of the pool sipping detection system[C]//Chinese Nuclear Society Nuclear Society Council General Dynamics and Seventh Annual Conference Proceedings. Beijing: China Atomic Energy Press, 2002: 25-29.
[15] 沈秋平, 陈志清, 徐道平, 等. 燃料组件修复装置的设计[J]. 核技术, 2010, 33(2): 148-151. Shen Qiuping, Chen Zhiqing, Xu Daoping, et al. Design of the fuel subassembly repairing device[J]. Nuclear Technology, 2010, 33(2): 148-151.
[16] 李卓群, 薛新才, 郑宏练, 等. 辐照后破损燃料组件修复工艺及其专用设备: 中国, 200610087598.8[P]. 2006-06-16. Li Zhuoqun, Xue Xincai, Zheng Honglian, et al. Damaged irradiated fuel assemblies repair technology and special equipment: China, 200610087598.8[P]. 2006-06-16.
[17] 张兴田, AFA2G 17×17型燃料组件辐照变形超声测试系统研制及在线测试[M]. 北京: 原子能出版社, 2006. Zhang Xingtian. Development of deformation ultrasonic testing system for AFA2G 17×17 irradiated fuel assemblies and online testing[M]. Beijing: Atomic Energy Press, 2006.
[18] 何明智. 秦山第二核电厂燃料组件运行经验[J]. 中国核电, 2009, 2 (4): 354-362. He Mingzhi. Fuelassembly operation experience in Qinshan II[J]. China Nuclear Power, 2009, 2(4): 354-362.
[19] 叶国栋, 潘泽飞, 张兴田. 中核集团秦山第二核电厂燃料管理持续改进[C]//中国核学会2009年学术年会论文集. 北京: 中国原子能出版社, 2009: 37-44. Ye Guodong, Pan Zefei, Zhang Xingtian. Continuous improvement of Qinshan nuclear power plant fuel management[C]//Chinese Nuclear Society 2009 Annual Conference Proceedings. Beijing: China Atomic Energy Press, 2009: 37-44.
[20] 万志坚, 唐月明, 杨波, 等. 压水堆核电站辐照后燃料组件变形检测方法及其实现装置: 中国, 200810172214.1[P]. 2008-10-31. Wan Zhijian, Tang Yueming, Yang Bo, et al. The deformation detection methods for irradiated PWR fuel assemblies and its implementation device: China, 200810172214.1[P]. 2008-10-31.
[21] 焦万均, 韩震宇, 先登飞, 等. 模拟核燃料组件变形检测系统原理及实现[J]. 计量与测试技术, 2006, 11(33): 30-31. Jiao Wanjun, Han Zhenyu, Xian Dengfei, et al. The principle & realization mesuring simulative fuel assemblis' distortion[J]. Measurement and Testing Technology, 2006, 11(33): 30-31.
[22] 先登飞, 韩震宇, 陈万良, 等. 用激光扫描投影法检测核燃料模拟组件变形[J]. 激光与红外, 2006, 36(3): 184-186. Xian Dengfei, Han Zhenyu, Chen Wanliang, et al. Measuring simulated nucleus fuel modules' distortions with laser scan and projection method[J]. Laser & Infrared, 2006, 36(3): 184-186.
[23] 先登飞. 核燃料组件变形检测系统样机研制[D]. 成都: 四川大学, 2006. Xian Dengfei. Development of nuclear fuel assembly deformation detection system prototype[D]. Chengdu: Sichuan University, 2006.
[24] 刘赫. 核燃料组件变形尺寸测量系统设计[D]. 成都: 四川大学, 2005. Liu He. Design on nuclear fuel assembly deformation measurement system[D]. Chengdu: Sichuan University, 2005.
[25] 刘敬露, 王颖, 先登飞. 浅谈核燃料组件变形的评价[J]. 机电工程技术, 2008, 37(1):110-117. Liu Jinglu, Wang Yin, Xian Dengfei. Evaluation to the nuclear fuel assembly distortion[J]. Mechanical & Electrical Engineering Technology, 2008, 37(1): 110-117.
[26] 邓昌义. 核燃料组件检查仪技术改造研究[D]. 成都: 四川大学, 2005. Deng Changyi. Study on transformation of a nuclear fuel assembly tester[D]. Chengdu: Sichuan University, 2005.
[27] 刘敬露. 核燃料组件变形的评价及其实现[D]. 成都: 四川大学, 2006. Liu Jinglu. Evaluation of nuclear fuel assembly deformation and its implementation[D]. Chengdu: Sichuan University, 2006.
[28] 高永明, 李声, 李丽丹. 燃料组件水下非接触变形测量方法[J]. 核动力工程, 2010, 4(31): 87-90. Gao Yongming, Li Sheng, Li Lidan. A method for survey of underwater non-contact deformation of fuel assemblies[J]. Nuclear Engineering, 2010, 4(31): 87-90.
[29] Zwicky H U, Wiktor C G, Schrire D. Spent fuel performance assessment and research[J]. Iaea Tecdoc 1343, 2003, 2(11): 76-84.
[30] Shin J. Equipment operation and maintenance manual for poolside examination system[C]. Korea: Korea Nuclear Factory, 2012.
[31] Otomo S, Seki T, Kataoka K, et al. Poolside fuel inspection experience and development at NFI[J]. Smirt eighteen, 2005, 14(3): 38-44.
Outlines

/